Lac-à-Paul Phosphate Project Pre-Feasibility Work Confirms $1 Billion NPV8 and 24% IRR

Saguenay, May 30, 2012. Ressources d’Arianne Inc. (the “Company” or “Arianne”) (TSX VENTURE:DAN)  (FRANKFURT:JE9N) (OTCBB:DRRSF) is pleased to announce the initial findings of an Enhanced Pre Feasibility Study (EPFS) confirming that a 3 million t/yr phosphate concentrate mine production scenario will generate an NPV8% of US$1Billion, a 23.7% IRR and a 3.8 year capital payback on a pre tax basis. The EPFS is being completed by Met-Chem Canada of Montreal, Quebec in compliance with NI  43101, and will be posted on the Arianne website and SEDAR within the next 45 days.  

The Company highlights the fact that this economic model does not include resource estimates for additional mineralization identified by core drilling completed since last fall (a portion of which was included in press releases in December 2011 and March 2012). That drilling confirmed the increase in strike length of Paul Zone mineralization from 1.3 km to in excess of 2.5 km. A new resource calculation will be completed with the Bankable Feasibility Study, which will begin this summer and be completed in  2013.  

Highlights of the Enhanced Pre-Feasibility Study ($US)* 

  • Measured & Indicated resources stay at 348 million tonnes of 6.50% P2O5  
  • Additional Inferred resources of 114 million tonnes at 5.46% P2O5 are not included in the Study
  • Combined Paul and Manouane proven and probable Mineral Reserves remain at 307 million  tonnes, with average grade of 6.59% P2O5 and average stripping ratio of 0.83 (Cut-off grade of  2.43% P2O5)
  • Annual production will average 3 million tonnes of 38% P2O5 apatite concentrate with low impurities
  • 17 year mine life at 50,000 tonnes ore/day production rate with average mill recovery of 90% 
  • Average concentrate price of $175/tonne FOB rail
  • Cash operating cost $80/tonne concentrate mine site ($90/tonne FOB rail)
  • Total Direct CAPEX Cost: $566 million 
  • Indirect CAPEX Cost: $137 million and Contingency: $92 million  
  • Total Initial CAPEX: $795 million  
  • Pre-tax IRR: 23.7%  
  • Pre-tax NPV 8%: $1.003 billion
  • Pre-tax Capital payback: 3.8 years

* Some of the figures above may undergo slight changes in completion of filing the NI 43-101report within  45 days. 

“It is clear that this 3 million tonne/year production scenario places our Lac a Paul project among the  lowest-cost and highest concentrate grades of new phosphate mines of the world” commented Bernard  Lapointe, CEO Arianne. “At this higher production rate, the project’s sensitivity to price improves by  50% such that today’s rock price would easily triple the pre-tax NPV 8%” he added. “Our Bankable  Feasibility Study will include a new resource calculation for the extended Paul zone mineralization indicated  by our drilling success over the past 9 months. This additional Paul Zone mineralization has the potential to  extend the Lac a Paul mine life beyond 25 years at this expanded production rate, he also added.”  

Technical data of this news release has been reviewed by Mary-Jean Buchanan, Eng. (Met-Chem) and  Daniel Boulianne, Geo. (Arianne), who are deemed to be Qualified Persons under NI 43-101.  

Ressources d’Arianne Inc. (www.arianne-inc.com) is developing the Lac à Paul phosphate-titanium  deposits approximately 200 km north of the Saguenay/Lac St. Jean area of Quebec, Canada. Metallurgical  testing of the ore has confirmed production of a high quality igneous apatite concentrate grading 39% P2O5 with little or no contaminant. The Company has 67 million shares outstanding.  

Forward Looking Statements and Information  

This news release contains “forward-looking statements” and “forward-looking information” within the meaning of  applicable securities regulations in Canada and the United States (collectively, “forward-looking information”). The  forward-looking information contained in this news release is made as of the date of this news release. Except as  required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to  update this forward-looking information. Forward-looking information includes, but is not limited to, statements with  respect to estimated mineral resources, anticipated effect of the completed drill results on the Project, timing of a  feasibility study, and timing and expectations of future work programs. Often, but not always, forward-looking  information can be identified by the use of words such as “plans”, “expects, “is expected”, “budget”, “scheduled”,  “estimates”, forecasts”, “intends”, “anticipates”, or “believes”, or the negatives thereof or variations of such words and  phrases or statements that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur  or be achieved.  

CAUTIONARY NOTE TO US READERS  

The SEC allows mining companies, in their filings with the SEC to disclose only those mineral deposits they can  economically and legally extract or produce. Accordingly, information contained in this News Release regarding our  mineral deposits may not be comparable to similar information made public by U.S. companies subject to the reporting  and disclosure requirements under the United States federal securities laws and the rules and regulations of the  Commission thereunder.  

In particular, this News Release uses the term “indicated” resources. U.S. readers are cautioned that while that term is  recognized and required by Canadian regulations, the SEC does not recognize it. U.S. investors are cautioned not to  assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.  

This News Release also uses the term “inferred” resources. U.S readers are cautioned that while this term is  recognized and required by Canadian regulations, the SEC does not recognize it. “Inferred resources” have a great  amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot  be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under  Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies,  except in rare cases. U.S. readers are cautioned not to assume that part or all of an inferred resource exists, or is  economically or legally mineable.  

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX  Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  

Source: Bernard Lapointe, CEO Tel: (418) 549-7316 bernard@arianne-inc.com 

Information: Jim Cowley, President Tel: (801) 599-3789 jim@arianne-inc.com  Louis Morin, Investors Relations Tél : (514) 845-1101 lmorin@thebidcapitalmarkets.com 

Follow Arianne on: 

Facebook: http://www.facebook.com/pages/Arianne-Resources-Inc/113071105425184

Twitter: http://twitter.com/arianne_dan 

Youtube: http://www.youtube.com/user/ArianneResources 

Flickr: http://www.flickr.com/photos/arianneresources 

Resource Investing News: http://resourceinvestingnews.com/?s=Arianne

en_US
Scroll to Top