Ressources d’Arianne inc. apporte un changement au plan de modification de prix et de prolongation des bons de souscription

CHICOUTIMI, April 16, 2013 – Arianne Resources Inc. (“Arianne”) (DAN: TSX-V), (Frankfurt: JE9N:FSE)  (DRRSF:OTC BB) has been informed by the TSX Venture Exchange that one of the conditions of its previously announced (see press release dated March 20, 2013) re-pricing and extension plan for the  4,000,000 common share purchase warrants (the “Warrants“) issued as part […]

Ressources d’Arianne inc. apporte un changement au plan de modification de prix et de prolongation des bons de souscription Read More »

Projet du Lac à Paul : les tests métallurgiques en laboratoire permettent d’obtenir un concentré titrant 40 % P2O5 et un taux de récupération de 87 %

Saguenay, March 21, 2013. The management of Ressources d’Arianne Inc.(“Arianne” or the “Company”) is pleased to announce that the Interim Bench-Scale Status Report has been delivered by Jacobs Engineering of Lakeland  Florida. The following is an excerpt from the report:  “During the five locked cycle tests, the cleaner 3 concentrate reached an average of 40%

Projet du Lac à Paul : les tests métallurgiques en laboratoire permettent d’obtenir un concentré titrant 40 % P2O5 et un taux de récupération de 87 % Read More »

Ressources d’Arianne Inc. s’implante activement dans la communauté dans le cadre de son projet minier du Lac à Paul, Saguenay ‐ Lac‐Saint‐Jean, Québec, Canada. Ouverture de bureaux et mise en place de partenariats

Alma, March 21, 2013. The management of Arianne Resources Inc. (“Arianne” or the “Company”) is pleased to announce the commencement of public consultations on the Transportation component of its project to operate a  phosphate mine in Lac à Paul, located at kilometre 168 on Chemin des Passes, in the Lac-Saint-Jean region. Public  meetings will be

Ressources d’Arianne Inc. s’implante activement dans la communauté dans le cadre de son projet minier du Lac à Paul, Saguenay ‐ Lac‐Saint‐Jean, Québec, Canada. Ouverture de bureaux et mise en place de partenariats Read More »

Projet du Lac à Paul :Les ressources mesurées et indiquées de la Zone Paul augmentées à 590 millions de tonnes métriques 

Saguenay, March 7, 2013. The management of Arianne Phosphate (“Arianne” or the “Company”) is pleased to announce that the updated mineral estimate for the Paul Zone amounts to 590 million metric tons (Mt) of measured and indicated resources. This National Instrument 43-101-compliant resource calculation conducted by GoldMinds  Geoservices Inc., in cooperation with Arianne personnel, provides

Projet du Lac à Paul :Les ressources mesurées et indiquées de la Zone Paul augmentées à 590 millions de tonnes métriques  Read More »

Arianne deviendra Arianne Phosphate Inc et vend ses autres projets

Saguenay, Québec (January 14, 2013) – Arianne Resources Inc. (the “Company” or “Arianne”) announced today that it will seek shareholders’ approval to change its name to “Arianne Phosphate Inc.” at its next annual general meeting of shareholders in May, 2013 to recognize the focus of its activities on developing the world class Lac à Paul

Arianne deviendra Arianne Phosphate Inc et vend ses autres projets Read More »

RESSOURCES D’ARIANNE PRÉSENTE SES RÉSULTATS DU TROISIÈME TRIMESTRE DE L’EXERCICE 2012

SAGUENAY, QUEBEC–(November 27, 2012) – Arianne Resources Inc. (the “Company” or “Arianne”) (TSX  VENTURE:DAN), (FRANKFURT:JE9N), (OTCBB:DRRSF) today filed its interim financial statements for the quarter ended September 30, 2012.   During the third quarter, Arianne made significant progress in the development of its Lac-a-Paul phosphate project,  including:   – The Pre-Feasibility Study Update (PFSU) was

RESSOURCES D’ARIANNE PRÉSENTE SES RÉSULTATS DU TROISIÈME TRIMESTRE DE L’EXERCICE 2012 Read More »

Nomination de Pierre Lortie au poste de Président du Conseil d’Administration

Saguenay, September 25, 2012. The management of Arianne Resources Inc. (the “Company” or “Arianne”) is pleased to announce the appointment of Mr. Pierre Lortie as Director of the Company and Chairman of the Board. In this new role,  Mr. Lortie will assist for the strategic directions of the Company.   Pierre Lortie is a senior Business

Nomination de Pierre Lortie au poste de Président du Conseil d’Administration Read More »

Ressources d’Arianne clôture une facilité de crédit de 10 M$ et un placement privé sans courtier de 1 M$

Saguenay, Québec (September 11, 2012) – Arianne Resources Inc. (the “Company” or “Arianne”) is pleased to announce that it has closed the previously announced Cdn$10 million credit facility and a Cdn$1 million non-brokered private placement (see press release of the Company dated July 26, 2012). The credit facility can be drawn on as required and

Arianne Closes a $10 Million Credit Facility and
a $1 Million Non-Brokered Private Placement
Read More »

D’ARIANNE MODIFIE SON RÉGIME D’OPTIONS D’ACHAT D’ACTIONS

Saguenay, August 24th, 2012. The board of directors of Arianne Resources Inc. (the “Company”) approved a  modification to the Company’s Stock option plan that will increase the number of options available for grant to 6,780,000  or less than 10 % of the Company’s issued shares. The previous plan permitted the grant of 6,400,000 stock options.

D’ARIANNE MODIFIE SON RÉGIME D’OPTIONS D’ACHAT D’ACTIONS Read More »

Arianne octroie le mandat de son Étude de Faisabilité à Cegertec WorleyParsons

Saguenay, Quebec, August 23, 2012. Arianne Resources Inc. (the “Company” or “Arianne”) is pleased to announce it has contracted with Cegertec WorleyParsons and Jacobs Engineering to produce the Bankable  Feasibility Study (BFS) for its Lac a Paul Phosphate mining project in Quebec.  Arianne Resources CEO Mr. Bernard Lapointe commented “These new contracts represent significant steps

Arianne octroie le mandat de son Étude de Faisabilité à Cegertec WorleyParsons Read More »

fr_CA
Scroll to Top