Projet du Lac à Paul : les tests métallurgiques en laboratoire permettent d’obtenir un concentré titrant 40 % P2O5 et un taux de récupération de 87 %
Saguenay, March 21, 2013. The management of Ressources d’Arianne Inc.(“Arianne” or the “Company”) is pleased to announce that the Interim Bench-Scale Status Report has been delivered by Jacobs Engineering of Lakeland Florida. The following is an excerpt from the report: “During the five locked cycle tests, the cleaner 3 concentrate reached an average of 40% […]
