{"id":5543,"date":"2026-05-14T06:24:58","date_gmt":"2026-05-14T11:24:58","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?p=5543"},"modified":"2026-06-10T12:10:24","modified_gmt":"2026-06-10T17:10:24","slug":"arianne-phosphate-successfully-produces-phosphoric-acid-on-a-continuous-basis","status":"publish","type":"post","link":"https:\/\/www.arianne-inc.com\/fr\/arianne-phosphate-successfully-produces-phosphoric-acid-on-a-continuous-basis\/","title":{"rendered":"ARIANNE PHOSPHATE PRODUIT AVEC SUCC\u00c8S DE L'ACIDE PHOSPHORIQUE DE FA\u00c7ON CONTINUE"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>SAGUENAY, QU\u00c9BEC \u2013 (le 14 mai 2026) \u2013 Arianne Phosphate inc. (la \u00ab Soci\u00e9t\u00e9 \u00bb ou \u00ab Arianne \u00bb) <\/strong><strong>(TSX VENTURE: DAN ; OTCQB : DRRSF ; FRANKFURT : JE9N)<\/strong>, une soci\u00e9t\u00e9 mini\u00e8re de phosphate en d\u00e9veloppement, qui fait progresser le projet Lac \u00e0 Paul dans la r\u00e9gion du Saguenay \u2013 Lac-Saint-Jean au Qu\u00e9bec, a le plaisir d'annoncer que l'acide phosphorique a \u00e9t\u00e9 produit avec succ\u00e8s de fa\u00e7on continue \u00e0 partir de son concentr\u00e9 de phosphate de haute puret\u00e9. Cet accomplissement marque la premi\u00e8re fois en plus de 130 ans que de l'acide phosphorique est produit en continu dans la province \u00e0 partir d'un concentr\u00e9 d'apatite provenant du Qu\u00e9bec. Ce travail a \u00e9t\u00e9 r\u00e9alis\u00e9 en partenariat avec Corem et avec le soutien de Ressources naturelles Canada (NRCan).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab L'importance du phosphate continue de cro\u00eetre alors qu'en m\u00eame temps les cha\u00eenes d'approvisionnement sont de plus en plus menac\u00e9es par des \u00e9v\u00e9nements g\u00e9opolitiques \u00bb, a d\u00e9clar\u00e9 Raphael Gaudreault, chef des op\u00e9rations d'Arianne Phosphate. \u00ab Cette perc\u00e9e est un autre exemple de la qualit\u00e9 de notre concentr\u00e9 de phosphate et d\u00e9montre l'opportunit\u00e9 d'une cha\u00eene d'approvisionnement en phosphate enti\u00e8rement localis\u00e9e ici au Qu\u00e9bec, Canada, qui pourrait mettre fin \u00e0 un si\u00e8cle de d\u00e9pendance \u00e0 la roche import\u00e9e. De plus, une grande partie du monde remet d\u00e9sormais en question ses cha\u00eenes d'approvisionnement et ce travail montre \u00e0 quel point Arianne sera un partenaire important et de confiance pour l'Occident pour ce mat\u00e9riel essentiel. Ce travail renforce la strat\u00e9gie canadienne sur les min\u00e9raux critiques, s\u00e9curise les mati\u00e8res premi\u00e8res nationales et positionne le Qu\u00e9bec comme chef de file nord-am\u00e9ricain dans la transition vers l'\u00e9nergie verte. \u00bb<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Lors des tests effectu\u00e9s \u00e0 Corem, l'entreprise a produit environ 1,5 tonne d'acide phosphorique de fa\u00e7on continue sur une p\u00e9riode d'une semaine. En raison de la nature du concentr\u00e9 de phosphate d'Arianne, l'acide phosphorique produit est facilement am\u00e9lior\u00e9 en acide phosphorique purifi\u00e9 (voir <a href=\"https:\/\/www.arianne-inc.com\/fr\/arianne-phosphate-receives-promising-purified-phosphoric-acid-production-ratios\/\">communiqu\u00e9 de presse dat\u00e9 du 9 avril 2026<\/a>), soit le mat\u00e9riau requis pour l'industrie des batteries LFP ainsi que pour la production d'engrais haute performance, de produits pharmaceutiques et de semi-conducteurs. De plus, le concentr\u00e9 de phosphate d'Arianne n\u00e9cessite beaucoup moins d'acide sulfurique pour produire son acide phosphorique, un autre avantage important puisque pr\u00e8s de 50% du soufre passe par le d\u00e9troit d'Ormuz<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab Pendant de nombreuses ann\u00e9es, l'approvisionnement en phosphate \u00e9tait tenu pour acquis, avec peu questionnant l\u2019acc\u00e8s \u00e0 ce mat\u00e9riau critique \u00bb, a d\u00e9clar\u00e9 Brian Ostroff, chef des initiatives strat\u00e9giques et commerciales. \u00ab Malgr\u00e9 ces vents contraires, Arianne a d\u00e9pens\u00e9 100 millions de dollars et plus de 15 ans pour faire avancer son projet Lac \u00e0 Paul. Aujourd'hui, Arianne poss\u00e8de le plus grand gisement de phosphate non d\u00e9velopp\u00e9 au monde, capable de produire un concentr\u00e9 de phosphate tr\u00e8s pur, et c'est la seule mine de phosphate autoris\u00e9e en Occident. Avec le gouvernement, l'industrie et les investisseurs qui comprennent d\u00e9sormais ce macro complexe, l'importance d'Arianne doit \u00eatre soulign\u00e9e. \u00bb<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Adoption de rapports financiers semestriels<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De plus, la Soci\u00e9t\u00e9 annonce l'adoption de rapports financiers semestriels (\u00ab RFS \u00bb). Ce communiqu\u00e9 de presse est \u00e9mis et d\u00e9pos\u00e9 conform\u00e9ment \u00e0 la D\u00e9cision g\u00e9n\u00e9rale coordonn\u00e9e 51-933 Dispenses permettant les rapports semestriels pour certains \u00e9metteurs \u00e9mergents (\u00ab CBO 51-933 \u00bb).&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le CBO 51-933 permet aux \u00e9metteurs de capital-risque admissibles de passer volontairement d'un cadre trimestriel \u00e0 un cadre semestriel de rapports financiers. En adoptant le RFS, Arianne vise \u00e0 r\u00e9duire le fardeau administratif et financier des rapports trimestriels. \u00c0 la suite de l'adoption du RFS, la Soci\u00e9t\u00e9 ne d\u00e9posera pas d'\u00e9tats financiers int\u00e9rimaires ni de rapport de gestion connexe pour la p\u00e9riode de trois mois se terminant le 31 mars et la p\u00e9riode de neuf mois se terminant le 30 septembre de chaque exercice fiscal applicable. En cons\u00e9quence, la p\u00e9riode int\u00e9rimaire initiale pour laquelle la Soci\u00e9t\u00e9 n'a pas l'intention de d\u00e9poser un rapport financier int\u00e9rimaire et le rapport de gestion connexe porteront sur les trois mois termin\u00e9s le 31 mars 2026. Arianne continuera de d\u00e9poser des \u00e9tats financiers annuels audit\u00e9s (\u00e0 \u00e9ch\u00e9ance dans les 120 jours suivant le 31 d\u00e9cembre) ainsi que des rapports financiers int\u00e9rimaires de six mois ainsi que le rapport de gestion connexes (\u00e0 \u00e9ch\u00e9ance dans les 60 jours suivant le 30 juin). La Soci\u00e9t\u00e9 demeure engag\u00e9e \u00e0 fournir des divulgations rapides et transparentes et continuera de rapporter tous les changements importants et d\u00e9veloppements importants comme requis par l'Instrument national 51-102 \u2013 <em>Obligations de divulgation continue<\/em>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Clarification concernant les bons de souscription bonus \u00e9mis dans le cadre de l'extension de la facilit\u00e9 de cr\u00e9dit<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Il est fait r\u00e9f\u00e9rence au communiqu\u00e9 de presse <a href=\"https:\/\/www.arianne-inc.com\/fr\/arianne-phosphate-closes-on-agreement-to-extend-its-credit-facilities\/\">d'Arianne dat\u00e9 du 1er avril 2026<\/a> annon\u00e7ant la cl\u00f4ture de l'accord d'extension de ses facilit\u00e9s de cr\u00e9dit. La Soci\u00e9t\u00e9 confirme que la restriction d'exercer les 25 millions de bons de souscription 2026 (tels que d\u00e9finis dans le communiqu\u00e9 de presse) si un tel exercice entra\u00eenerait que le pr\u00eateur (tel que d\u00e9fini dans le communiqu\u00e9) d\u00e9tienne, sur une base partiellement dilu\u00e9e, plus de 19,9% des actions ordinaires \u00e9mises et en circulation d'Arianne s'applique \u00e9galement dans le cas d'une transaction de regroupement d'entreprises (telle que d\u00e9finie dans le communiqu\u00e9) et,  par cons\u00e9quent, l'exercice des bons de souscription 2026 demeure soumis \u00e0 l'approbation de la Bourse de croissance TSXV (la \u00ab Bourse \u00bb) et, si exig\u00e9 par la Bourse, des actionnaires ind\u00e9pendants de la Soci\u00e9t\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>\u00c0 propos d\u2019Arianne:<\/strong><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\">Arianne (<a href=\"https:\/\/www.arianne-inc.com\/fr\/\" target=\"_self\">www.arianne-inc.com<\/a>) d\u00e9veloppe les gisements de phosphate de Lac \u00e0 Paul situ\u00e9s \u00e0 environ 200 km au nord de la r\u00e9gion de Saguenay\/Lac Saint-Jean au Qu\u00e9bec (Canada). Ces gisements produiront un concentr\u00e9 d\u2019apatite ign\u00e9e de haute qualit\u00e9 titrant 39\u00a0% de P2O5 avec peu ou pas de contaminants (\u00e9tude de faisabilit\u00e9 publi\u00e9e en 2013).<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\"><strong>Personne qualifi\u00e9e:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Raphael Gaudreault, ing., une personne qualifi\u00e9e conform\u00e9ment au R\u00e8glement 43-101 a approuv\u00e9 l\u2019information technique dans le pr\u00e9sent communiqu\u00e9. M.\u00a0Gaudreault est \u00e9galement chef des op\u00e9rations de la Soci\u00e9t\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>La Bourse de croissance TSX et son fournisseur de services de r\u00e9glementation (selon le sens donn\u00e9 \u00e0 ce terme dans les politiques de la Bourse de croissance TSX) n\u2019assument aucune responsabilit\u00e9 quant \u00e0 la pertinence ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Coordonn\u00e9es:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\" style=\"border-style:none;border-width:0px\"><tbody><tr><td><strong>Technique<\/strong><\/td><td><strong>Info<\/strong><\/td><\/tr><tr><td>Raphael Gaudreault<\/td><td>Brian Ostroff<\/td><\/tr><tr><td>Chef des op\u00e9rations<\/td><td>Chef des initiatives strat\u00e9giques et commerciales<\/td><\/tr><tr><td>T\u00e9l.\u00a0: 418-590-1318<\/td><td>T\u00e9l.\u00a0: 514-928-9952<\/td><\/tr><tr><td><a href=\"mailto:raphael.gaudreault@arianne-inc.com\">raphael.gaudreault@arianne-inc.com<\/a><\/td><td><a href=\"mailto:brian.ostroff@arianne-inc.com\">brian.ostroff@arianne-inc.com<\/a><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez Arianne sur\u00a0:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Facebook:&nbsp;<a href=\"https:\/\/www.facebook.com\/ariannephosphate\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">https:\/\/www.facebook.com\/ariannephosphate<\/a><br>Twitter:&nbsp;<a href=\"http:\/\/twitter.com\/arianne_dan\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">http:\/\/twitter.com\/arianne_dan<\/a><br>YouTube:&nbsp;<a href=\"http:\/\/www.youtube.com\/user\/ArianneResources\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">http:\/\/www.youtube.com\/user\/ArianneResources<\/a><br>Flickr:&nbsp;<a href=\"http:\/\/www.flickr.com\/photos\/arianneresources\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">http:\/\/www.flickr.com\/photos\/arianneresources<\/a><br>Ressources Investing News:&nbsp;<a href=\"http:\/\/resourceinvestingnews.com\/?s=Arianne\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">http:\/\/resourceinvestingnews.com\/?s=Arianne<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde concernant les informations prospectives<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\"><strong><em>Le pr\u00e9sent communiqu\u00e9 de presse contient des \u00ab\u00a0d\u00e9clarations prospectives\u00a0\u00bb et de l\u2019\u00ab\u00a0information prospective\u00a0\u00bb au sens des r\u00e9glementations sur les valeurs mobili\u00e8res applicables au Canada et aux \u00c9tats-Unis (collectivement, l\u2019\u00ab\u00a0information prospective\u00a0\u00bb). L\u2019information prospective comprend, sans s\u2019y limiter, la qualit\u00e9 et la production anticip\u00e9e du concentr\u00e9 d\u2019apatite par la Soci\u00e9t\u00e9 au projet Lac \u00e0 Paul. Souvent, mais pas toujours, les informations prospectives peuvent \u00eatre identifi\u00e9es par l\u2019utilisation de termes tels que \u00ab\u00a0planifie\u00a0\u00bb, \u00ab\u00a0s\u2019attend \u00e0\u00a0\u00bb, \u00ab\u00a0est pr\u00e9vu\u00a0\u00bb, \u00ab\u00a0budget\u00a0\u00bb, \u00ab\u00a0pr\u00e9vu\u00a0\u00bb, \u00ab\u00a0estimations\u00a0\u00bb, \u00ab\u00a0pr\u00e9visions\u00a0\u00bb, \u00ab\u00a0a l\u2019intention de\u00a0\u00bb, \u00ab\u00a0anticipe\u00a0\u00bb ou \u00ab\u00a0croit\u00a0\u00bb, ou la n\u00e9gation de ces termes ou de variations de ces mots et expressions ou de d\u00e9clarations selon lesquelles certaines mesures, certains \u00e9v\u00e9nements ou certains r\u00e9sultats \u00ab\u00a0peuvent\u00a0\u00bb, \u00ab\u00a0pourraient\u00a0\u00bb, \u00ab\u00a0devraient\u00a0\u00bb, \u00ab\u00a0pourraient\u00a0\u00bb ou \u00ab\u00a0seront\u00a0\u00bb pris, survenir ou \u00eatre atteints.<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Les informations prospectives sont assujetties \u00e0 des risques, incertitudes et autres facteurs connus et inconnus qui pourraient faire en sorte que les r\u00e9sultats r\u00e9els, le niveau d\u2019activit\u00e9, le rendement ou les r\u00e9alisations de la Soci\u00e9t\u00e9 diff\u00e8rent consid\u00e9rablement de ceux exprim\u00e9s ou sous-entendus par ces informations prospectives, notamment, sans toutefois s\u2019y limiter\u00a0: la volatilit\u00e9 du cours de l\u2019action; les risques li\u00e9s aux changements des prix des mati\u00e8res premi\u00e8res; les sources et le co\u00fbt des installations \u00e9nerg\u00e9tiques; l\u2019estimation des exigences en capital initial et continu; l\u2019estimation des co\u00fbts de main-d\u2019\u0153uvre et d\u2019exploitation; les conditions g\u00e9n\u00e9rales des march\u00e9s et de l\u2019\u00e9conomie mondiaux; les risques associ\u00e9s \u00e0 l\u2019exploration; au d\u00e9veloppement et \u00e0 l\u2019exploitation des gisements min\u00e9raux; l\u2019estimation des r\u00e9serves et des ressources min\u00e9rales; les risques associ\u00e9s aux risques non assurables survenant au cours de l\u2019exploration; du d\u00e9veloppement et de la production; les risques associ\u00e9s aux fluctuations mon\u00e9taires; les risques environnementaux; la concurrence l\u2019embauche de personnel exp\u00e9riment\u00e9; l\u2019acc\u00e8s \u00e0 des infrastructures ad\u00e9quates pour soutenir les activit\u00e9s mini\u00e8res, de traitement, de d\u00e9veloppement et d\u2019exploration; les risques li\u00e9s aux changements dans le r\u00e9gime r\u00e9glementaire minier r\u00e9gissant la Soci\u00e9t\u00e9; l\u2019ach\u00e8vement du processus d\u2019\u00e9valuation environnementale; les risques li\u00e9s aux retards r\u00e9glementaires et d\u2019obtention de permis; les risques li\u00e9s aux conflits d\u2019int\u00e9r\u00eats potentiels; la d\u00e9pendance \u00e0 l\u2019\u00e9gard du personnel cl\u00e9; les risques de financement, de capitalisation et de liquidit\u00e9, y compris le risque que le financement n\u00e9cessaire pour financer les activit\u00e9s d\u2019exploration et de d\u00e9veloppement continues au projet Lac \u00e0 Paul ne soit pas disponible aux conditions acceptables, ou pas du tout; le risque de dilution potentielle par l\u2019\u00e9mission d\u2019actions ordinaires; le risque de litiges.&nbsp;<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Les informations prospectives sont fond\u00e9es sur des hypoth\u00e8ses que la direction juge raisonnables au moment o\u00f9 ces d\u00e9clarations sont faites, y compris, sans s\u2019y limiter, la poursuite des activit\u00e9s d\u2019exploration, l\u2019absence de variation d\u00e9favorable importante des prix des produits de base, la r\u00e9alisation des plans d\u2019exploration et de d\u00e9veloppement conform\u00e9ment aux plans et la r\u00e9alisation des r\u00e9sultats attendus de ces plans, la r\u00e9ception de l\u2019approbation r\u00e9glementaire requise, ainsi que les autres hypoth\u00e8ses et facteurs \u00e9nonc\u00e9s aux pr\u00e9sentes. Bien que la Soci\u00e9t\u00e9 ait tent\u00e9 d\u2019identifier les facteurs importants qui pourraient faire en sorte que les r\u00e9sultats r\u00e9els diff\u00e8rent sensiblement de ceux contenus dans l\u2019information prospective, il peut y avoir d\u2019autres facteurs qui font en sorte que les r\u00e9sultats ne correspondent pas \u00e0 ce qui est pr\u00e9vu, estim\u00e9 ou souhait\u00e9. Rien ne garantit que ces informations prospectives se r\u00e9v\u00e9leront exactes, car les r\u00e9sultats r\u00e9els et les \u00e9v\u00e9nements futurs pourraient diff\u00e9rer consid\u00e9rablement de ceux anticip\u00e9s dans ces informations prospectives. Par cons\u00e9quent, le lecteur ne doit pas se fier outre mesure \u00e0 l\u2019information prospective. L\u2019information prospective est fournie \u00e0 la date du pr\u00e9sent communiqu\u00e9 de presse et la Soci\u00e9t\u00e9 ne s\u2019engage pas \u00e0 mettre \u00e0 jour cette information prospective, sauf conform\u00e9ment aux lois applicables en mati\u00e8re de valeurs mobili\u00e8res.<\/em><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>SAGUENAY, QUEBEC &#8211; (May 14, 2026) &#8211; Arianne Phosphate Inc (the \u201cCompany\u201d or \u201cArianne\u201d) (TSX VENTURE: DAN; OTCQB: DRRSF; FRANKFURT: JE9N), a development-stage phosphate mining company, advancing the Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region, , is pleased to announce that phosphoric acid has been successfully produced on a continuous basis using its high-purity [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[31],"tags":[],"news-year":[],"class_list":["post-5543","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/comments?post=5543"}],"version-history":[{"count":1,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5543\/revisions"}],"predecessor-version":[{"id":5544,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5543\/revisions\/5544"}],"wp:attachment":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/media?parent=5543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/categories?post=5543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/tags?post=5543"},{"taxonomy":"news-year","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/news-year?post=5543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}