{"id":5382,"date":"2025-12-11T16:14:02","date_gmt":"2025-12-11T16:14:02","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?p=5382"},"modified":"2025-12-11T16:14:05","modified_gmt":"2025-12-11T16:14:05","slug":"arianne-phosphate-provides-an-update-on-its-ministerial-decree","status":"publish","type":"post","link":"https:\/\/www.arianne-inc.com\/fr\/arianne-phosphate-provides-an-update-on-its-ministerial-decree\/","title":{"rendered":"ARIANNE PHOSPHATE FOURNIT UNE MISE \u00c0 JOUR SUR SON D\u00c9CRET MINIST\u00c9RIEL"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>SAGUENAY, QU\u00c9BEC \u2013 (11 d\u00e9cembre 2025) \u2013 Arianne Phosphate (la \u00ab Soci\u00e9t\u00e9 \u00bb ou \u00ab Arianne \u00bb) (TSX VENTURE : DAN; OTCQX : DRRSF; FRANCFORT : JE9N), <\/strong>une entreprise mini\u00e8re de phosphate en phase de d\u00e9veloppement, faisant avancer le projet Lac \u00e0 Paul dans la r\u00e9gion de Saguenay-Lac-Saint-Jean, au Qu\u00e9bec, a le plaisir d'annoncer que la Soci\u00e9t\u00e9 a confirm\u00e9 aupr\u00e8s du gouvernement du Qu\u00e9bec que son d\u00e9cret minist\u00e9riel restera valide pendant deux ans pendant que le processus de prolongation du d\u00e9cret est en cours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Obtenu en d\u00e9cembre 2015, le projet Lac \u00e0 Paul d'Arianne a re\u00e7u l'approbation du gouvernement du Qu\u00e9bec pour son d\u00e9veloppement, avec une p\u00e9riode initiale d'autorisation valable de 10 ans. Par la suite, le 28 mai 2025, le gouvernement du Qu\u00e9bec a adopt\u00e9 le projet de loi 81, qui modifie divers r\u00e8glements entourant le processus de d\u00e9livrance de permis et les dispositions environnementales connexes pour les projets miniers qu\u00e9b\u00e9cois. En 2024, la direction d'Arianne a entam\u00e9 des discussions avec le minist\u00e8re de l'Environnement (le \u00ab minist\u00e8re \u00bb) concernant la prolongation de son permis et a d\u00e9j\u00e0 soumis plusieurs des \u00e9tudes requises pour sa prolongation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab La validit\u00e9 de notre permis est un \u00e9l\u00e9ment cl\u00e9 pour la Soci\u00e9t\u00e9 et ses parties prenantes \u00bb, a d\u00e9clar\u00e9 Raphael Gaudreault, chef des op\u00e9rations d'Arianne Phosphate. \u00ab De plus, cette extension offre \u00e0 l'industrie et aux partenaires potentiels le confort n\u00e9cessaire pour faire avancer le d\u00e9veloppement du projet et r\u00e9pondre au besoin de ce min\u00e9ral critique. \u00bb<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le phosphate, historiquement consid\u00e9r\u00e9 comme une denr\u00e9e agricole cl\u00e9, a \u00e9galement gagn\u00e9 en popularit\u00e9 gr\u00e2ce \u00e0 son utilisation dans des technologies avanc\u00e9es de batteries telles que la batterie lithium-fer-phosphate (\u00ab LFP \u00bb). La demande pour le LFP a rapidement augment\u00e9 au cours des derni\u00e8res ann\u00e9es, alors que des applications telles que les VE et les syst\u00e8mes de stockage d'\u00e9nergie (\u00ab ESS \u00bb) gagnent en popularit\u00e9. Le d\u00e9fi pour le LFP et d'autres technologies de batteries, ainsi que l'acc\u00e8s aux min\u00e9raux critiques requis, est la domination chinoise. Dans le cas du LFP, la Chine repr\u00e9sente plus de 95% de toute la production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reconnaissant l'importance strat\u00e9gique du phosphate, le gouvernement am\u00e9ricain a r\u00e9cemment d\u00e9sign\u00e9 le phosphate comme min\u00e9ral critique, rejoignant l'UE, le Canada ainsi que les provinces du Qu\u00e9bec et de l'Ontario qui l'ont \u00e9galement ajout\u00e9 \u00e0 leurs listes respectives de min\u00e9raux critiques.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Le Lac \u00e0 Paul d'Arianne est, et demeure, le seul projet de phosphate non d\u00e9velopp\u00e9 pleinement autoris\u00e9 et pr\u00eat \u00e0 construire en Am\u00e9rique du Nord et est le leader mondial pour r\u00e9pondre au besoin imm\u00e9diat de phosphate de l'Occident provenant d'une juridiction g\u00e9opolitiquement s\u00e9curis\u00e9e. Situ\u00e9e au Qu\u00e9bec, au Canada, l'entreprise a fait avancer son projet gr\u00e2ce \u00e0 un investissement de plus de 100 millions de dollars et 15 ans de travail. Le projet abrite le plus grand gisement de phosphate non d\u00e9velopp\u00e9 au monde, b\u00e9n\u00e9ficie d'un acc\u00e8s facile aux infrastructures n\u00e9cessaires et b\u00e9n\u00e9ficie d'un fort soutien du public, des Premi\u00e8res Nations et du gouvernement. Le gisement est g\u00e9ologiquement rare, \u00e9tant ign\u00e9, et permet de transformer facilement son concentr\u00e9 de phosphate de haute puret\u00e9 et faible teneur en contaminants en acide phosphorique purifi\u00e9 (\u00ab APP \u00bb); l'ingr\u00e9dient n\u00e9cessaire pour la batterie LFP. Arianne a \u00e9galement publi\u00e9 des \u00e9tudes concernant l'intention de la soci\u00e9t\u00e9 de poursuivre la production d\u2019APP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Processus de prolongation du d\u00e9cret<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L'amendement pr\u00e9voit que l'autorisation demeure valide jusqu'\u00e0 ce qu'une d\u00e9cision sur la demande de prolongation soit prise. Le ministre dispose d'une p\u00e9riode maximale de deux ans apr\u00e8s l'expiration de la p\u00e9riode initiale pour formuler sa recommandation au gouvernement. Pour Arianne, cette p\u00e9riode se prolonge jusqu'en d\u00e9cembre 2027. En cas de r\u00e9ponse positive, la prolongation serait d'une p\u00e9riode pouvant aller jusqu'\u00e0 cinq ans \u00e0 compter de l'approbation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph translation-block\"><strong>Personne qualifi\u00e9e:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Raphael Gaudreault, ing, Personne qualifi\u00e9e par le R\u00e8glement 43-101, a approuv\u00e9 les informations techniques incluses dans ce communiqu\u00e9. M. Gaudreault est \u00e9galement chef de l'exploitation de la soci\u00e9t\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>d\u2019Arianne Phosphate<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arianne Phosphate (\u00ab Arianne Phosphate Inc. \u00bb) (<a href=\"https:\/\/www.arianne-inc.com\/fr\/\">www.arianne-inc.com\/fr\/<\/a>) d\u00e9veloppe les gisements de phosphate de Lac \u00e0 Paul situ\u00e9s \u00e0 environ 200 km au nord de la r\u00e9gion de Saguenay\/Lac St. Jean, au Qu\u00e9bec, Canada. Ces gisements produiront un concentr\u00e9 d'apatite ign\u00e9e de haute qualit\u00e9 avec une teneur de 39% en P<sub>2<\/sub>O<sub>5<\/sub> avec peu ou pas de contaminants (\u00e9tude de faisabilit\u00e9 publi\u00e9e en 2013). La Soci\u00e9t\u00e9 d\u00e9tient 213 714 811 actions en circulation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>La Bourse de croissance TSX et son fournisseur de services de r\u00e9glementation (selon le sens donn\u00e9 \u00e0 ce terme dans les politiques de la Bourse de croissance TSX) n\u2019assument aucune responsabilit\u00e9 quant \u00e0 la pertinence ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8211; 30 &#8211;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Coordonn\u00e9es:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Technique<\/strong><\/td><td><strong>Info<\/strong><\/td><\/tr><tr><td>Raphael Gaudreault<\/td><td>Brian Ostroff<\/td><\/tr><tr><td>Chef des op\u00e9rations<\/td><td>Chef des initiatives strat\u00e9giques et commerciales<\/td><\/tr><tr><td>T\u00e9l.\u00a0: 418-590-1318<\/td><td>T\u00e9l.\u00a0: 514-928-9952<\/td><\/tr><tr><td><a href=\"mailto:raphael.gaudreault@arianne-inc.com\">raphael.gaudreault@arianne-inc.com<\/a><\/td><td>brian.ostroff@arianne-inc.com<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez Arianne sur\u00a0:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Facebook:&nbsp;<a href=\"https:\/\/www.facebook.com\/ariannephosphate\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.facebook.com\/ariannephosphate<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">LinkedIn: <a href=\"https:\/\/www.linkedin.com\/company\/arianne-phosphate-inc-tsx-v-dan\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">https:\/\/www.linkedin.com\/company\/arianne-phosphate-inc-tsx-v-dan<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Twitter:&nbsp;<a href=\"http:\/\/twitter.com\/arianne_dan\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/twitter.com\/arianne_dan<\/a><br>YouTube:&nbsp;<a href=\"http:\/\/www.youtube.com\/user\/ArianneResources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.youtube.com\/user\/ArianneResources<\/a><br>Flickr:&nbsp;<a href=\"http:\/\/www.flickr.com\/photos\/arianneresources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.flickr.com\/photos\/arianneresources<\/a><br>Ressources Investing News:&nbsp;<a><\/a><a href=\"http:\/\/resourceinvestingnews.com\/?s=Arianne\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/resourceinvestingnews.com\/?s=Arianne<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde concernant les informations prospectives<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Ce communiqu\u00e9 contient des \u00ab d\u00e9clarations prospectives \u00bb et des \u00ab informations prospectives \u00bb au sens des r\u00e8glements sur les valeurs mobili\u00e8res applicables au Canada et aux \u00c9tats-Unis (collectivement, \u00ab informations prospectives \u00bb). Les informations prospectives incluent, sans s'y limiter, la qualit\u00e9 et la production anticip\u00e9es du concentr\u00e9 d'apatite lors du projet Lac \u00e0 Paul, ainsi que la production anticip\u00e9e de PPA. Souvent, mais pas toujours, l'information prospective peut \u00eatre identifi\u00e9e par l'utilisation de mots tels que \u00ab planifie \u00bb, \u00ab s'attend, \u00ab est attendu \u00bb, \u00ab budget \u00bb, \u00ab planifi\u00e9 \u00bb, \u00ab estime \u00bb, pr\u00e9visions \u00bb, \u00ab a l'intention \u00bb, \u00ab anticipe \u00bb ou \u00ab croit \u00bb, ou les aspects n\u00e9gatifs ou variations de ces mots, expressions ou d\u00e9clarations selon lesquelles certaines actions, \u00e9v\u00e9nements ou r\u00e9sultats \u00ab peuvent \u00bb, \u00ab pourraient \u00bb, \u00ab voudraient \u00bb, \u00ab pourraient \u00bb ou \u00ab seront \u00bb r\u00e9alis\u00e9s. Les informations prospectives sont sujettes \u00e0 des risques, incertitudes et autres facteurs connus et inconnus qui peuvent faire en sorte que les r\u00e9sultats r\u00e9els, le niveau d'activit\u00e9, la performance ou les r\u00e9alisations de la Soci\u00e9t\u00e9 diff\u00e8rent substantiellement de ceux exprim\u00e9s ou sous-entendus par ces informations prospectives, y compris, mais sans s'y limiter : le prix volatil de l'action; des risques li\u00e9s aux variations des prix des mati\u00e8res premi\u00e8res; sources et co\u00fbts des installations \u00e9lectriques; l'estimation des besoins initiaux et durables en capital; l'estimation des co\u00fbts de main-d'\u0153uvre et d'exploitation; les march\u00e9s mondiaux g\u00e9n\u00e9raux et les conditions \u00e9conomiques; les risques associ\u00e9s \u00e0 l'exploration, au d\u00e9veloppement et \u00e0 l'exploitation des gisements min\u00e9raux; l'estimation des r\u00e9serves et ressources min\u00e9rales; les risques associ\u00e9s aux risques non assurables survenant au cours de l'exploration, du d\u00e9veloppement et de la production; les risques associ\u00e9s aux fluctuations mon\u00e9taires; les risques environnementaux; la concurrence \u00e9tait rencontr\u00e9e pour obtenir du personnel exp\u00e9riment\u00e9; l'acc\u00e8s \u00e0 des infrastructures ad\u00e9quates pour soutenir les activit\u00e9s mini\u00e8res, de transformation, de d\u00e9veloppement et d'exploration; les risques associ\u00e9s aux changements dans le r\u00e9gime r\u00e9glementaire minier r\u00e9gissant la Soci\u00e9t\u00e9; compl\u00e9tion du processus d'\u00e9valuation environnementale; des risques li\u00e9s aux retards r\u00e9glementaires et d'obtention des permis; des risques li\u00e9s \u00e0 d'\u00e9ventuels conflits d'int\u00e9r\u00eats; la d\u00e9pendance au personnel cl\u00e9; les risques de financement, de capitalisation et de liquidit\u00e9, y compris le risque que le financement n\u00e9cessaire pour financer la poursuite des activit\u00e9s d'exploration et de d\u00e9veloppement au projet Lac \u00e0 Paul ne soit pas disponible \u00e0 des conditions satisfaisantes, voire pas du tout; le risque de dilution potentielle par l'\u00e9mission d'actions ordinaires; le risque de litige. L'information prospective repose sur des hypoth\u00e8ses que la direction juge raisonnables au moment o\u00f9 ces d\u00e9clarations sont faites, incluant mais sans s'y limiter, la poursuite des activit\u00e9s d'exploration, l'absence de changement n\u00e9gatif important des prix des mati\u00e8res premi\u00e8res, les plans d'exploration et de d\u00e9veloppement se d\u00e9roulant conform\u00e9ment aux plans et que ces plans atteignent leurs r\u00e9sultats escompt\u00e9s, la r\u00e9ception de l'approbation r\u00e9glementaire requise, ainsi que d'autres hypoth\u00e8ses et facteurs \u00e9nonc\u00e9s ici. Bien que la Soci\u00e9t\u00e9 ait tent\u00e9 d'identifier des facteurs importants qui pourraient faire en sorte que les r\u00e9sultats r\u00e9els diff\u00e8rent de mani\u00e8re significative de ceux contenus dans l'information prospective, il peut y avoir d'autres facteurs qui font en sorte que les r\u00e9sultats ne soient pas comme pr\u00e9vu, estim\u00e9 ou escompt\u00e9. Il n'y a aucune garantie que ces informations prospectives seront exactes, car les r\u00e9sultats r\u00e9els et les \u00e9v\u00e9nements futurs pourraient diff\u00e9rer de mani\u00e8re significative de ceux anticip\u00e9s dans ces informations. Par cons\u00e9quent, les lecteurs ne devraient pas se fier excessivement \u00e0 l'information prospective. Les informations prospectives sont fournies \u00e0 la date de ce communiqu\u00e9 de presse, et la Soci\u00e9t\u00e9 ne s'engage pas \u00e0 mettre \u00e0 jour ces informations prospectives sauf en conformit\u00e9 avec les lois applicables sur les valeurs mobili\u00e8res.<\/em><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>SAGUENAY, QUEBEC \u2013 (December 11, 2025) \u2013 Arianne Phosphate (the \u201cCompany\u201d or \u201cArianne\u201d) (TSX VENTURE: DAN; OTCQX: DRRSF; FRANKFURT: JE9N), a development-stage phosphate mining company, advancing the Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region, is pleased to announce that the Company has confirmed with the Government of Quebec that its Ministerial Decree will remain [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[31],"tags":[],"news-year":[],"class_list":["post-5382","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/comments?post=5382"}],"version-history":[{"count":1,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5382\/revisions"}],"predecessor-version":[{"id":5383,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/5382\/revisions\/5383"}],"wp:attachment":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/media?parent=5382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/categories?post=5382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/tags?post=5382"},{"taxonomy":"news-year","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/news-year?post=5382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}