{"id":4739,"date":"2025-03-13T11:48:52","date_gmt":"2025-03-13T11:48:52","guid":{"rendered":"https:\/\/www.arianne-inc.com\/?p=4739"},"modified":"2025-03-13T13:43:01","modified_gmt":"2025-03-13T13:43:01","slug":"arianne-phosphate-names-pierre-fitzgibbon-as-a-strategic-advisor-to-the-company","status":"publish","type":"post","link":"https:\/\/www.arianne-inc.com\/fr\/arianne-phosphate-names-pierre-fitzgibbon-as-a-strategic-advisor-to-the-company\/","title":{"rendered":"ARIANNE PHOSPHATE NOMME PIERRE FITZGIBBON CONSEILLER STRAT\u00c9GIQUE DE LA SOCI\u00c9T\u00c9"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><strong>SAGUENAY (QU\u00c9BEC) \u2013 (13 mars 2025) \u2013 Arianne Phosphate (la \u00ab Soci\u00e9t\u00e9 \u00bb ou \u00ab Arianne \u00bb) (TSX CROISSANCE : DAN; OTCQX : DRRSF; FRANCFORT : JE9N), <\/strong>a development-stage phosphate mining company, advancing the Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region, is pleased to announce that Pierre Fitzgibbon will be joining the Company as a strategic advisor.&nbsp; In his role as strategic advisor, Mr. Fitzgibbon will provide guidance to Arianne\u2019s management in regard to business strategy and help target potential partners for the development of the project.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Jusqu'en septembre 2024, M. Fitzgibbon a \u00e9t\u00e9 ministre de l'\u00c9conomie, de l'Innovation et de l'\u00c9nergie du Qu\u00e9bec, ministre responsable du d\u00e9veloppement \u00e9conomique r\u00e9gional et ministre responsable de la r\u00e9gion de Montr\u00e9al. \u00c0 ce titre, M. Fitzgibbon a \u00e9t\u00e9 un ardent d\u00e9fenseur de l'industrie mini\u00e8re dans la province et a jou\u00e9 un r\u00f4le actif dans l'avancement du Qu\u00e9bec en tant qu'acteur majeur dans le domaine des mat\u00e9riaux pour batteries et des min\u00e9raux critiques. Avant d'entrer en politique, M. Fitzgibbon a occup\u00e9 des fonctions dans plusieurs soci\u00e9t\u00e9s financi\u00e8res de premier plan, notamment la soci\u00e9t\u00e9 de capital-investissement Walter Capital Partners (associ\u00e9 directeur) et la Financi\u00e8re Banque Nationale (vice-pr\u00e9sident et directeur financier). M. Fitzgibbon a \u00e9galement occup\u00e9 plusieurs postes op\u00e9rationnels au cours de sa carri\u00e8re, notamment celui de pr\u00e9sident-directeur g\u00e9n\u00e9ral d'Atrium Innovations, ainsi que de Domtar et Peerless Carpet. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab Je suis t\u00e9moin de l\u2019\u00e9volution du projet Arianne depuis ses d\u00e9buts, notamment lorsque j'\u00e9tais membre du conseil d'administration \u00bb, a d\u00e9clar\u00e9 Pierre Fitzgibbon. \u00ab Comme beaucoup le savent, je crois depuis longtemps \u00e0 l'avenir des batteries et que le Qu\u00e9bec peut avoir un r\u00f4le cl\u00e9 \u00e0 jouer dans l'\u00e9cosyst\u00e8me nord-am\u00e9ricain et occidental. De plus, j'ai toujours soutenu l'id\u00e9e de mettre en place une structure permettant au Qu\u00e9bec de transformer ses propres min\u00e9raux critiques en mat\u00e9riaux essentiels pour les \u00e9tapes en aval. En ce qui concerne plus particuli\u00e8rement le phosphate, Arianne devrait jouer un r\u00f4le cl\u00e9 dans la mesure o\u00f9 l'industrie se tourne de plus en plus vers l'utilisation de batteries LFP et je crois que je peux aider la Soci\u00e9t\u00e9 \u00e0 faire de son projet une r\u00e9alit\u00e9. \u00bb <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab Pierre et moi nous connaissons depuis de nombreuses ann\u00e9es, y compris lorsqu'il travaillait pour Arianne, o\u00f9 nous avions une solide relation de travail \u00bb, a d\u00e9clar\u00e9 Brian Ostroff, pr\u00e9sident d'Arianne Phosphate. \u00ab Je me r\u00e9jouis de notre nouvelle collaboration et je sais que l'exp\u00e9rience et le r\u00e9seau de Pierre contribueront \u00e0 acc\u00e9l\u00e9rer les discussions d'Arianne avec des partenaires potentiels, alors que nous cherchons \u00e0 mener notre projet \u00e0 terme. Pierre a un tr\u00e8s bon sens des affaires, il est connu internationalement et il a de l'exp\u00e9rience dans l'avancement de projets miniers critiques ici au Qu\u00e9bec. \u00bb <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">En 2024, le phosphate a \u00e9t\u00e9 ajout\u00e9 \u00e0 la liste des min\u00e9raux critiques du Qu\u00e9bec et du Canada. Arianne poss\u00e8de le projet de phosphate du Lac \u00e0 Paul au Qu\u00e9bec, Canada. Le projet abrite le plus grand gisement de phosphate enti\u00e8rement nouveau au monde, b\u00e9n\u00e9ficie d'un acc\u00e8s facile aux infrastructures existantes et est enti\u00e8rement autoris\u00e9. En raison de la nature ign\u00e9e rare du gisement, Arianne peut produire un concentr\u00e9 de phosphate de tr\u00e8s haute puret\u00e9, \u00e0 faible teneur en contaminants, qui est facilement transform\u00e9 en acide phosphorique purifi\u00e9 (\u00ab APP \u00bb). <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Au-del\u00e0 de son utilisation dans les engrais, le phosphate, et en particulier l\u2019APP, est un ingr\u00e9dient n\u00e9cessaire \u00e0 la batterie lithium-fer-phosphate (\u00ab LFP \u00bb). La batterie LFP est aujourd'hui la plus connue des batteries en raison de son utilisation dans les v\u00e9hicules \u00e9lectriques et les syst\u00e8mes de stockage d'\u00e9nergie, et son adoption rapide et continue n\u00e9cessitera davantage d'ingr\u00e9dients. Aujourd'hui, la Chine repr\u00e9sente plus de 95 % de la production totale de LFP et, comme l'Occident cherche \u00e0 s\u00e9curiser sa propre cha\u00eene d'approvisionnement, le projet d'Arianne sera une n\u00e9cessit\u00e9. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dans le cadre de son r\u00f4le de conseiller strat\u00e9gique, la Soci\u00e9t\u00e9 a octroy\u00e9 \u00e0 M. Fitzgibbon 300 000 options. Ces options permettent \u00e0 M. Fitzgibbon d'acheter une action ordinaire de la Soci\u00e9t\u00e9 jusqu'au 13 mars 2027, au prix de 0,14 $ par action, soit le cours de cl\u00f4ture des actions de la Soci\u00e9t\u00e9 le jour de bourse pr\u00e9c\u00e9dant la date d'attribution. Les options sont soumises \u00e0 une p\u00e9riode d'acquisition et sont \u00e9galement soumises \u00e0 l'approbation des autorit\u00e9s r\u00e9glementaires. M. Fitzgibbon ne recevra aucune r\u00e9mun\u00e9ration en esp\u00e8ces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><strong>\u00c0 propos d\u2019Arianne:<\/strong><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Arianne Phosphate Inc. (<a href=\"https:\/\/www.arianne-inc.com\/fr\/\">www.arianne-inc.com\/fr\/<\/a>\/fr\/) d\u00e9veloppe les gisements de phosphate de Lac \u00e0 Paul situ\u00e9s \u00e0 environ 200 km au nord de la r\u00e9gion de Saguenay\/Lac St. Jean, au Qu\u00e9bec, Canada. Ces gisements produiront un concentr\u00e9 d'apatite ign\u00e9e de haute qualit\u00e9 avec une teneur en P<sub>2<\/sub>O<sub>5<\/sub> et contenant peu ou pas de contaminants (\u00ab Feasibility Study to Produce 3Mtpy of High Purity Apatite Concentrate at the Lac \u00e0 Paul Project, Qu\u00e9bec, Canada \u00bb publi\u00e9e le 13 novembre 2013). La Soci\u00e9t\u00e9 compte 202 890 210 actions en circulation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Personne qualifi\u00e9e<\/strong><br>Rapha\u00ebl Gaudreault, ing., Personne Qualifi\u00e9e par le R\u00e8glement 43-101, a approuv\u00e9 l\u2019information technique de ce communiqu\u00e9. M. Gaudreault est \u00e9galement le chef des op\u00e9rations.<br>release. Mr. Gaudreault is also the Company\u2019s Chief Operating Officer.<\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><em>caract\u00e8re ad\u00e9quat ou \u00e0 l\u2019exactitude du pr\u00e9sent communiqu\u00e9 de presse.<br>the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.<\/em><\/p>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\">&#8211; 30 \u2013<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Coordonn\u00e9es:<\/strong><br>Technical:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Raphael Gaudreault, COO&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Tel. : 418-590-1318&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <a href=\"mailto:raphael.gaudreault@arianne-inc.com\">raphael.gaudreault@arianne-inc.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Info:&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Brian Ostroff, President &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Tel. : 418 549-7316&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <a href=\"mailto:brian.ostroff@arianne-inc.com\">brian.ostroff@arianne-inc.com<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Medias: &nbsp;&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Sandra Ataman &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Tel. : 819-859-0280&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; sandra@ryanap.com<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Suivez Arianne sur\u00a0:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Facebook:&nbsp;<a href=\"https:\/\/www.facebook.com\/ariannephosphate\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.facebook.com\/ariannephosphate<\/a><br>Twitter:&nbsp;<a href=\"http:\/\/twitter.com\/arianne_dan\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/twitter.com\/arianne_dan<\/a><br>YouTube:&nbsp;<a href=\"http:\/\/www.youtube.com\/user\/ArianneResources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.youtube.com\/user\/ArianneResources<\/a><br>Flickr:&nbsp;<a href=\"http:\/\/www.flickr.com\/photos\/arianneresources\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/www.flickr.com\/photos\/arianneresources<\/a><br>Ressources Investing News:&nbsp;<a><\/a><a href=\"http:\/\/resourceinvestingnews.com\/?s=Arianne\" target=\"_blank\" rel=\"noreferrer noopener\">http:\/\/resourceinvestingnews.com\/?s=Arianne<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Mise en garde concernant les informations prospectives<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Le pr\u00e9sent communiqu\u00e9 de presse contient des \u00ab \u00e9nonc\u00e9s prospectifs \u00bb et des \u00ab informations prospectives \u00bb au sens de la r\u00e9glementation sur les valeurs mobili\u00e8res applicable au Canada et aux \u00c9tats-Unis (collectivement, les \u00ab informations prospectives \u00bb). Les informations prospectives comprennent, sans toutefois s'y limiter, des informations relatives \u00e0 l'avancement du projet d'acide phosphorique propos\u00e9 et l'acc\u00e9l\u00e9ration des discussions avec d'autres parties en lien avec le projet. Souvent, mais pas toujours, les informations prospectives peuvent \u00eatre identifi\u00e9es par l'emploi de mots tels que \u00ab planifie \u00bb, \u00ab s'attend \u00e0 \u00bb, \u00ab est pr\u00e9vu \u00bb, \u00ab budget \u00bb, \u00ab planifi\u00e9 \u00bb, \u00ab estime \u00bb, \u00ab pr\u00e9visions \u00bb, \u00ab a l'intention de \u00bb, \u00ab anticipe \u00bb ou \u00ab croit \u00bb, ou la forme n\u00e9gative de ces mots et expressions ou des variantes de ces mots et expressions ou des \u00e9nonc\u00e9s selon lesquels certaines actions, certains \u00e9v\u00e9nements ou certains r\u00e9sultats \u00ab peuvent \u00bb, \u00ab pourraient \u00bb, \u00ab devraient \u00bb ou \u00ab vont \u00bb \u00eatre pris, se produire ou \u00eatre atteints. Les informations prospectives sont soumises \u00e0 des risques connus et inconnus, \u00e0 des incertitudes et \u00e0 d'autres facteurs qui peuvent faire en sorte que les r\u00e9sultats r\u00e9els, le niveau d'activit\u00e9, la performance ou les r\u00e9alisations de la Soci\u00e9t\u00e9 soient sensiblement diff\u00e9rents de ceux exprim\u00e9s ou sous-entendus par ces informations prospectives, y compris, mais sans s'y limiter : la volatilit\u00e9 du cours des actions ; les risques li\u00e9s aux variations des prix des mati\u00e8res premi\u00e8res ; les sources et le co\u00fbt des installations \u00e9lectriques ; l'estimation des besoins en capital initiaux et de maintien ; l'estimation des co\u00fbts de main-d'\u0153uvre et d'exploitation ; les march\u00e9s mondiaux et les conditions \u00e9conomiques g\u00e9n\u00e9rales ; le risque associ\u00e9 \u00e0 l'exploration, au d\u00e9veloppement et \u00e0 l'exploitation de gisements min\u00e9raux ; l'estimation des r\u00e9serves et des ressources min\u00e9rales; les risques associ\u00e9s aux risques non assurables survenant au cours de l'exploration, du d\u00e9veloppement et de la production; les risques associ\u00e9s aux fluctuations des devises; les risques environnementaux; la concurrence \u00e0 laquelle fait face la Soci\u00e9t\u00e9 pour recruter du personnel exp\u00e9riment\u00e9; l'acc\u00e8s \u00e0 une infrastructure ad\u00e9quate pour soutenir les activit\u00e9s d'exploitation mini\u00e8re, de traitement, de d\u00e9veloppement et d'exploration; les risques associ\u00e9s aux changements dans le r\u00e9gime r\u00e9glementaire minier r\u00e9gissant la Soci\u00e9t\u00e9; l'ach\u00e8vement du processus d'\u00e9valuation environnementale; les risques li\u00e9s aux retards r\u00e9glementaires et d'obtention de permis; les risques li\u00e9s aux conflits d'int\u00e9r\u00eats potentiels; la d\u00e9pendance envers le personnel cl\u00e9; les risques de financement, de capitalisation et de liquidit\u00e9, y compris le risque que le financement n\u00e9cessaire pour financer les activit\u00e9s d'exploration et de d\u00e9veloppement continues du projet Lac \u00e0 Paul ne soit pas disponible \u00e0 des conditions satisfaisantes, ou pas du tout; le risque de dilution potentielle par l'\u00e9mission d'actions ordinaires; le risque de litige. Les informations prospectives sont fond\u00e9es sur des hypoth\u00e8ses que la direction consid\u00e8re comme raisonnables au moment o\u00f9 ces \u00e9nonc\u00e9s sont faits, y compris, mais sans s'y limiter, la poursuite des activit\u00e9s d'exploration, l'absence de changement d\u00e9favorable important dans les prix des mati\u00e8res premi\u00e8res, les plans d'exploration et de d\u00e9veloppement se d\u00e9roulant conform\u00e9ment aux plans et ces plans atteignant les r\u00e9sultats escompt\u00e9s d\u00e9clar\u00e9s, l'obtention de l'approbation r\u00e9glementaire requise et d'autres hypoth\u00e8ses et facteurs tels qu'\u00e9nonc\u00e9s dans le pr\u00e9sent document. Bien que la Soci\u00e9t\u00e9 ait tent\u00e9 d'identifier les facteurs importants qui pourraient entra\u00eener des r\u00e9sultats r\u00e9els sensiblement diff\u00e9rents de ceux contenus dans les informations prospectives, il peut y avoir d'autres facteurs qui pourraient entra\u00eener des r\u00e9sultats diff\u00e9rents de ceux anticip\u00e9s, estim\u00e9s ou pr\u00e9vus. Rien ne garantit que ces informations prospectives se r\u00e9v\u00e9leront exactes, car les r\u00e9sultats r\u00e9els et les \u00e9v\u00e9nements futurs pourraient diff\u00e9rer sensiblement de ceux anticip\u00e9s dans ces informations prospectives. Par cons\u00e9quent, les lecteurs ne doivent pas se fier ind\u00fbment aux informations prospectives. Les informations prospectives sont formul\u00e9es \u00e0 la date du pr\u00e9sent communiqu\u00e9 de presse et la Soci\u00e9t\u00e9 ne s'engage pas \u00e0 mettre \u00e0 jour ces informations prospectives, sauf conform\u00e9ment aux lois sur les valeurs mobili\u00e8res applicables.<\/em><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>SAGUENAY, QUEBEC \u2013 (March 13, 2025) \u2013 Arianne Phosphate (the \u201cCompany\u201d or \u201cArianne\u201d) (TSX VENTURE: DAN; OTCQX: DRRSF; FRANKFURT: JE9N), a development-stage phosphate mining company, advancing the Lac \u00e0 Paul project in Quebec\u2019s Saguenay-Lac-Saint-Jean region, is pleased to announce that Pierre Fitzgibbon will be joining the Company as a strategic advisor.&nbsp; In his role as [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[31],"tags":[],"news-year":[],"class_list":["post-4739","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/4739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/comments?post=4739"}],"version-history":[{"count":5,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/4739\/revisions"}],"predecessor-version":[{"id":4747,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/posts\/4739\/revisions\/4747"}],"wp:attachment":[{"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/media?parent=4739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/categories?post=4739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/tags?post=4739"},{"taxonomy":"news-year","embeddable":true,"href":"https:\/\/www.arianne-inc.com\/fr\/wp-json\/wp\/v2\/news-year?post=4739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}